What should you do first?

Before collecting goods from a China factory, reconcile the inspection report with the approved specification and the cargo actually packed. Identify accepted, rejected and unresolved cartons, confirm final quantity and transport measurements, and separate packaging damage from product acceptance. The person assigned release authority should then send one current instruction to collect, collect with a named exception, or hold. A packing list supports that decision but does not create authority.

How this guide is maintained

Forest Leopard Operations reviews the shipment workflow against the official sources listed below. This page provides planning information, not legal, tax or product-compliance advice.

Read our editorial standards

A factory message saying that an order is ready does not answer the collection question when an inspection has found a shortage, defect or damaged carton. Before the forwarder sends a vehicle, the buyer should identify the cargo covered by the inspection, separate accepted and unresolved goods, and obtain one current instruction from the person assigned authority to release or hold the shipment.

This guide concerns the operational handoff from a China supplier to a forwarder. Its sampling and carrier examples describe general or service-specific methods, not universal China shipping rules.

Start with the lot, not the supplier’s status message

Use the purchase order, approved drawing or sample, packaging specification and inspection report as one comparison set. Confirm the production lot or batch, inspected quantity, inspection date and specification version. If the report covers an earlier batch than the cargo now packed, treat that mismatch as an open exception until the assigned quality decision owner resolves it.

Describe each issue in observable terms: a material substitution, a dimension outside tolerance, cosmetic damage, insufficient protection, missing units or an unidentified carton. Connect the requirement, evidence and affected quantity. This gives the decision owner enough information to choose between correction, replacement, concession, partial collection or a hold.

Do not let a commercial remedy stand in for a cargo decision. A price concession does not establish which cartons may move, and repacking does not prove that the product inside meets specification. For mixed results, require the supplier to separate accepted, rejected and unresolved goods and map each group to carton or pallet identifiers.

Use sampling to support a decision, not a guarantee

Acceptance sampling is a lot-level decision method. NIST states that “the main purpose of acceptance sampling is to decide whether or not the lot is likely to be acceptable, not to estimate the quality of the lot.” NIST’s acceptance-sampling explanation supports that distinction. A sampled approval therefore should not be communicated to the forwarder as proof that every packed unit is defect-free.

Ask whether the sample actually represents the lot proposed for collection. ASQ explains that “Samples are most effective at catching defects when they are representative.” ASQ’s sampling guidance supports checking selection coverage, not simply recording a pass result. The inspection record should identify the lot, sample size, selection method, defect categories and acceptance rule. Note unfinished, inaccessible or newly packed goods as limitations.

If the report lacks those details, the quality decision owner should decide whether clarification or another inspection is required. Do not keep drawing samples until a favorable result appears. Any additional inspection should follow an agreed plan and decision rule, with the newly examined goods mapped to the shipment that will actually be collected.

Convert the packing list into a collection control

The forwarder needs cargo data that describes the physical shipment at collection, not an early estimate. Reconcile the following fields before dispatch:

Control fieldCheck againstResult of a mismatch
Product and quantityPurchase order, inspection coverage, packed units and carton marksDefine the quantity authorized to move and identify excluded units.
Carton or pallet identityFinal count, labels, dimensions, gross weight and net weightIssue corrected transport data and prevent the wrong cargo from being loaded.
Collection readinessPickup address, ready date, loading access and supplier contactResolve timing or access before the vehicle is dispatched.
Open exceptionAffected identifiers, remedy, owner and decision deadlineState whether the cargo is held, conditionally approved or excluded.

Keep units and measurement status explicit. Mark figures as final, provisional or awaiting confirmation. For a parcel measurement example, UPS says, “Round up to the nearest whole number when taking your measurements.” UPS’s United States measurement guide supports that named carrier method. It should not be applied automatically to ocean freight, pallets or another carrier’s rating rules.

Assess damaged cartons separately from the goods

Outer damage is evidence of a packaging or handling concern, not by itself proof that the contents are damaged. Photograph the affected carton, its marks and the internal protection when the decision depends on the contents. Compare the packaging with the agreed requirement, then decide whether the carton must be opened, inspected, repacked or held.

UPS gives parcel-packing guidance that says, “Use a rigid box with flaps attached, and do not exceed the maximum weight limit for the box.” UPS’s packaging guidance is a useful carrier-specific reference for that point. It is not a universal specification for export cartons, pallets or containerized cargo. The purchase order and transport plan remain the controlling references for the actual shipment.

When repacking is completed, compare the revised physical cargo with the old list. Update carton identifiers, count, dimensions and weights where they changed, and preserve photographs that link the correction to the affected cartons. A corrected package with an obsolete packing list can still cause the forwarder to collect or rate the wrong cargo.

Separate document completeness from release authority

A complete packing list shows what information is available; it does not authorize movement. The authority to accept a defect, release a partial order or stop collection must come from the person or function assigned in the contract, quality process, purchase order or booking instruction. A buyer’s coordinator, warehouse employee or forwarder should not be treated as having universal authority merely because they are present at pickup.

Once the assigned decision owner has reviewed the evidence, issue one controlling instruction linked to the shipment brief. Use a clear status such as approved for identified cartons, approved with a named exception, or on hold pending a specified action. Include the decision owner, affected identifiers, quantity, conditions and deadline. State which earlier message the instruction replaces so the supplier and forwarder are not working from conflicting approvals.

For recurring commercial cargo, the B2B importer freight workflow provides a relevant context for connecting purchase-order review, consolidation and documentation. For fulfillment cargo, the Amazon FBA freight workflow is relevant when cargo, labels and the receiving plan must be coordinated before collection.

Example: a partial collection with two damaged cartons

Hypothetical example: A purchase order covers 500 units. The factory reports 480 packed units and two cartons with damaged corners. The shortage is 20 units, calculated as 500 minus 480, or 4% of the order. That is a quantity calculation only; it does not establish a defect rate or show that the 480 units conform to specification.

The assigned decision owner first asks whether the missing units are unfinished, rejected or unavailable. The owner also decides whether the damaged cartons need opening, inspection or repacking. If 480 units are authorized for collection, the supplier should identify the approved cartons, isolate the damaged or unresolved cartons, and provide a written shortage record with an owner and deadline for the remaining 20 units.

If repacking changes the shipment measurements, the supplier must provide revised data before dispatch. The forwarder’s instruction should then identify the approved quantity and carton marks, state what is excluded, list any loading conditions and provide the contact for a physical mismatch at pickup.

Questions that arise at the loading stage

The practical test is whether the forwarder can identify the approved cargo without interpreting a disputed report. Any uncertainty should remain visible in the instruction rather than being resolved informally at the truck.

Frequently asked questions

What should I do if the factory changes carton numbers after inspection?+

Ask the factory to map the inspected goods to the new carton numbers and explain whether the change involved packaging only or product substitution. The assigned quality decision owner should determine whether the inspection still covers the proposed cargo. Update the packing list and collection instruction before the forwarder loads anything under the new identifiers.

Who decides whether a damaged carton can be collected?+

The person or function assigned release authority in the purchase, quality or booking process should decide. The forwarder can report the physical condition and ask for direction, but arrival of a vehicle does not create approval. The instruction should state whether the carton is approved, requires inspection or must remain on hold.

How do I handle replacement units collected later?+

Treat the replacement as a separate collection with its own packing list and instruction linked to the original shortage record. Identify the units it fulfills, confirm the carton identifiers and obtain the inspection evidence required by the agreed quality process. Close the shortage only after the replacement quantity is reconciled.

Official sources

Sources were last checked on 2026-10-25. Requirements and carrier practices can change; verify the current official page before booking.

  1. 6.2.1. What is Acceptance Sampling?NIST/SEMATECH e-Handbook
  2. Sampling in Quality Control - What is Quality Sampling? | ASQASQ
  3. Shipping Dimensions and Weight | UPS - United StatesUPS
  4. How to Pack a Box or Pallet for Shipping | UPS - United StatesUPS

Change log

  1. Initial publication of the reviewed panel article.